GENLOGGet a quote ↗
GENLOG / DOCUMENT

Read a bill of lading: review the draft systematically

A practical order for checking parties, cargo and routing before approving a B/L draft.

In this guide
  1. Review information in groups
  2. Read a bill of lading by information group
  3. A controlled draft approval workflow
  4. A seal change followed by a consignee request
  5. Questions about issue and release
  6. Before approval
  7. References
  8. Next guide

Overview

Read a bill of lading: review the draft systematically

A bill of lading is an important transport document; issuance and delivery arrangements depend on its type and applicable terms. Not every B/L is negotiable, and a sea waybill should not be assumed to have original-bill presentation procedures.

Review information in groups

Start with shipper, consignee and notify party, followed by receipt, loading, discharge and delivery places. Then reconcile packages, weight, cargo description, container and seal. Understand each party’s role rather than copying one company into every field.

Read a bill of lading by information group

Compare the draft with the approved shipping instructions, current booking and commercial agreement. Identify whether the carrier or a forwarder issues the document. House and master references may differ; the relationship between their parties and shipment records must remain traceable.

InformationReviewEvidence
Shipper, consignee, notifyLegal identity, address and role; notify is not automatically the receiverApproved SI and buyer instructions
RouteReceipt, loading, discharge and delivery points where applicableCurrent booking
CargoPackages, description, weight, container and sealPacking list and stuffing record
Freight and issuePrepaid/collect, document type and originals if applicableTransport agreement and payment requirements

A controlled draft approval workflow

  1. Assign one person to consolidate amendments and a final approver; allow time before the issuer’s amendment deadline.
  2. Name each file with shipment reference, date and revision. Keep a change register rather than parallel annotated copies.
  3. Review identities and route, then check packages, weight, container and seal character by character.
  4. Have finance or the relevant bank review documentary payment requirements. Do not assume every bill format satisfies a letter of credit.
  5. Submit one consolidated response showing old and new values. Obtain a revised draft and verify the amendments.
  6. Retain approval evidence and the final document. Track document delivery or release instructions separately from payment obligations.

A seal change followed by a consignee request

A seal is replaced after inspection but the draft still shows the previous number. Obtain the replacement record identifying the container, time and both seals; update the SI and ask the issuer to confirm the revised draft. Editing an internal PDF does not amend the carrier’s record.

A simultaneous consignee change requires a separate authority and payment-document review. Do not disguise a commercial change as a spelling correction. Availability, charges and processing depend on issue status, voyage stage and applicable requirements. Record who approved the change and the issuer’s written response.

Questions about issue and release

  • Is every B/L negotiable? No; document type and wording matter. Named-party and order documents need separate consideration.
  • Is a sea waybill equivalent to a set of original bills? Confirm its different delivery mechanism with the issuer before choosing.
  • Does a PDF permit collection? A checking copy does not automatically meet release conditions; verify document, payment and receiver-identification requirements.
  • What if cargo is damaged? Preserve condition records, dates, photographs and inspection evidence; notify relevant parties promptly and check contractual claim time limits.

Before approval

Reconcile with SI and commercial documents. Confirm document type and issuance instructions, plus receiver or bank requirements where relevant. Ask about amendment deadlines and charges. A draft is not an issued document or proof that release conditions are met.

References

GENLOG practical guide, reviewed on 24 October 2026 using public primary sources. Examples are illustrations, not official tariffs or contract templates.

Read the primary source

Next guide

Commercial invoice and packing list: different jobs in one file

Next guide
Get a quote